A new deck can go in this year and a patio can follow later. Planning where they meet gives you a better starting point for both estimates and helps you explain which parts of the yard need to stay usable between phases.
Start with the route from the house to the yard
Sketch the back door, deck, stairs and the part of the yard you want to use for seating or meals. Mark where you expect the stairs to land. If the patio comes later, ask the contractor to show how the stairs and yard access would work in both phases. If you are keeping an existing walk or patio, mark that on the sketch too.
Plan around the work that comes later
Ask where materials and equipment can enter the yard for each phase. Note fences, gates, landscaping and other features you want to keep. Ask the contractor to review the grade, drainage, deck posts and future patio edge together before either scope is finalized. If you are talking to separate contractors, share the same sketch and ask who will confirm the dimensions where their work meets.
Compare two completed projects
On the Bellevue deck and patio project, the deck was built first. The later concrete phase included a low retaining wall and drainage along the patio edge. The Omaha deck and patio project shows another layout, with stairs connecting an upper deck to a patio below.
Ask for a scope you can use for both phases
Have each estimate identify the work included now, the conditions that need review, and the decisions that carry into the next phase. Share your jobsite address, rough measurements, the parts of the yard you want to keep and which phase you would like to start with.