This Omaha bathroom project began with a water leak. The homeowner needed the damage addressed and also wanted to use the repair work as an opportunity to upgrade the bathroom.
Repairing what was beneath the bathroom
Superb Construction mitigated the water damage and replaced the damaged subfloor before rebuilding the room. The project’s Jobber photos show the opened floor and drying equipment during that stage of the work.
Those repairs are an important part of the story, even though they are hidden beneath the finished bathroom. The work combined damage repair with the homeowner’s plans for a different look and feel.
Rebuilding with a white Onyx finish
The bathroom upgrade included a white Onyx surround and a renewed bathroom interior. The light finish gives the compact room a consistent appearance, with the window incorporated into the surround.
Superb Construction also helped the homeowner through the insurance approval process as the water-damage repairs and bathroom upgrade moved forward.
This project is a useful example for homeowners whose repair needs overlap with remodeling plans. Addressing the damaged structure and selecting the new finishes required attention to both the condition of the room and how the homeowner wanted to use it.
Water-damage repair stage
The bathroom floor opened to the joists with drying equipment beside the repair area.
Plan a similar project
Thinking about a new shower or bathroom layout? Explore bathroom remodeling. If the room needs repairs after drying is complete, see water damage reconstruction.
See Tony’s bathroom before and after for another example of a remodel that followed water damage.
Discuss your bathroom project or browse more project photos.


